Berth Planning

Base Document

Vessel Arrival Notice:

Action Item:

Berth Planning

Stockyard Planning

Resource Planning

Equipment Planning

Berth Planning Table:

|Sl.NO. |Field Name |Field Size |Field Type |Nullable |

|1 |VAN No. | | | |

|2 |Schedule Start Date & Time(ETA) | | | |

|3 |Schedule End Date & Time(ETD) | | | |

|4 |Allotted Berth | | | |

|5 |Total Berth Time | | | |

|6 |Berth Allocation ID | | | |

|7 |Priority | | | |

|8 |Double Banking | | | |

Berth Allocated Check List:

Berth Occupied for any other movement or not?

Berth can handle that vessel

DWT

Cargo

LOA

Beam

Safe zone

Cargo Type

Draft

If Equipment available on the berth is it Mandatory or Not

Berth is under maintenance or not? If Yes system should not allow for (BAP)

Before Allocating system should check point 2 above and it satisfied, system should allow the allocation/planning for that Berth.

If the Berth is already occupied with another vessel, system should populate a message / popup to the user with ‘Red’ color saying that for which vessel / VAN the...