Berth Planning
Base Document
Vessel Arrival Notice:
Action Item:
Berth Planning
Stockyard Planning
Resource Planning
Equipment Planning
Berth Planning Table:
|Sl.NO. |Field Name |Field Size |Field Type |Nullable |
|1 |VAN No. | | | |
|2 |Schedule Start Date & Time(ETA) | | | |
|3 |Schedule End Date & Time(ETD) | | | |
|4 |Allotted Berth | | | |
|5 |Total Berth Time | | | |
|6 |Berth Allocation ID | | | |
|7 |Priority | | | |
|8 |Double Banking | | | |
Berth Allocated Check List:
Berth Occupied for any other movement or not?
Berth can handle that vessel
DWT
Cargo
LOA
Beam
Safe zone
Cargo Type
Draft
If Equipment available on the berth is it Mandatory or Not
Berth is under maintenance or not? If Yes system should not allow for (BAP)
Before Allocating system should check point 2 above and it satisfied, system should allow the allocation/planning for that Berth.
If the Berth is already occupied with another vessel, system should populate a message / popup to the user with ‘Red’ color saying that for which vessel / VAN the...