6
a.
B
35
D
35
H A
25 30
E
15
G
40
C
30
F
65
b. c.
C = production time per day/required output per day = (450 minutes/day)/360units per day = 1.25 minutes per unit or 75 seconds per unit
Work station I
Task A C E F B G D H
Task time 30 30 15 65 35 40 35 25
Idle time
0 10
II III
0
IV
15
d.
Efficiency =
275 T = = .917 or 91.7% 4(75) N aC
5
Chapter 4
7.
a.
C = production time per day/required output per day = (7.5 hour per day) (3600 seconds per hour)/1000units per day = 27 seconds per unit
b.
D
12
H
9
K B
15 24
E
18
I
14
A
15
L
10
F C
6 7
J
7
G
11
Work station I
Task A C B E F I D G H J K L
Task time 15 6 24 18 7 14 12 11 9 7 15 10
Idle time 6 3
II III
2
IV
1
V
0
VI
2
c.
Efficiency =
148 T = = .914 or 91.4% 6(27) N aC
d. Reduce cycle time to 25 ((7.5*3600)/1100 = 24.54 seconds), which requires rebalancing the line or work overtime: (100 units) 27 seconds per unit = 2700 seconds or 45 minutes of overtime.
6
Manufacturing Processes
8.
a.
a
70
d
10
g
60
j
25
b
40
e
30
h
50
l k
20 25
c
45
f
20
i
15
b.
C = production time per day/required output per day = (7.5 hour per day) (3600 seconds per hour)/300 units per day = 90 seconds per unit
c. d.
Ni =
T 410 = 4.56 → 5 work stations = C 90
Work station I
Task a d g j c b e h f I k l
Task time 70 10 60 25 45 40 30 50 20 15 20 25
Idle time 10
II
5
III
5
IV
10
V
10
e. Efficiency =
410 T = = .911 or 91.1% 5(90) N aC
7
Chapter 4
f.
Reduce cycle time to 81 seconds per unit. This produces (7.5 hours)(3600 seconds per hour)/81 seconds per units = 333.3 units. Another option is to work 45 minutes overtime (7.5 x 10% = .75 hour or 45 minutes). There are many other options possible that are combinations of these...