Submitted by: Submitted by vinit
Views: 299
Words: 5075
Pages: 21
Category: Business and Industry
Date Submitted: 12/24/2012 12:09 AM
Interim Report
IPTV reduction in Commercial Vehicles
&
LCV wheel Rim Failure by Six Sigma Methodology
Interim Report
IPTV reduction in Commercial Vehicles
&
LCV wheel Rim Failure by Six Sigma Methodology
KaramVeer Singh
MBA-Tech (C.S)
376
KaramVeer Singh
MBA-Tech (C.S)
376
Interim Report
Presented by
-------------------------------------------------
KaramVeer Singh
-------------------------------------------------
Based on the training undertaken in
-------------------------------------------------
Tata Motors, CVBU, Pune
-------------------------------------------------
Project
IPTV reduction in Commercial Vehicles
&
LCV wheel Rim Failure by Six Sigma Methodology
Industry Guide
-------------------------------------------------
Mr. R.J. Nagare
-------------------------------------------------
Faculty Supervisor
-------------------------------------------------
PROF. V. Seshadri
-------------------------------------------------
Contents
Confidentiality Agreement 3
Acknowledgement 5
About the company 6
Part1: 9
IPTV Reduction in Commercial Vehicles by CFT 9
Abstract 10
1. Introduction 11
1.1 Goal 11
2. Main Text/Methodology 11
2.1 Phase One 11
2.1.1 Plan Phase 11
2.1.2 Do Phase 16
2.1.3 Check Phase 17
2.1.4. Act Phase 17
3. Learning/Work Done 18
4. Schedule 19
Part2: 20
LCV wheel Rim Failure by Six Sigma Methodology 20
Abstract 21
1. Introduction 22
2. Main Text/ Methodology 22
2.1 Define Phase 23
3. Learning 27
References 27
Confidentiality Agreement
The RECIPIENT should agree as follows:
1. The RECEPIENT shall treat as confidential all information, particularly technical or business information of CVBU whether written or oral, the RECEPIENT received in the course of the project hereinafter referred to as "Project"), to which the RECEPIENT gained access or which the RECEPIENT otherwise obtained in the course of said...