Sequential and Selection Process Control Structure

Submitted by: Submitted by

Views: 553

Words: 278

Pages: 2

Category: Science and Technology

Date Submitted: 02/22/2013 11:01 PM

Report This Essay

Associate Program Material

Appendix G

Sequential and Selection Process Control Structure

In the following example, the second line of the table specifies that tax due on a salary of $2,000.00 is $225.00 plus 16% of excess salary over $1,500.00 (that is, 16% of $500.00). Therefore, the total tax is $225.00 + $80.00, or $305.00.

| |Salary Range in Dollars |Base Tax in Dollars |Percentage of Excess |

|1 |0.00-1,499.99 |0.00 |15 % |

|2 |1,500.00-2,999.99 |225.00 |16 % |

|3 |3,000.00-4,999.99 |465.00 |18 % |

|4 |5,000.00-7,999.99 |825.00 |20 % |

|5 |8,000.00-14,999.99 |1425.00 |25 % |

|Input |Processes |Output |

|Name First | Get user input |Name First |

|Last | |Last |

|Salary | |Salary |

|Input salary |Determine salary range |Range of salary |

|Salary range |Calculate Base tax and Percentage of Excess|Determine Base Tax and Percentage Of Excess|

|Base tax in dollars...