SAVINGS ACCRUED THROUGH ULTRATECH CONCRETE | |
|[pic] |
|Use of UltraTech Concrete provides numerous advantages over site mixed concrete and results in superior quality and overall |
|savings. |
|Description |
|Saving in UltraTech Concrete |
| |
|Wastages in Site Mixing: Cement spillage, shortages in quantity of aggregate and sand during delivery, storage and mixing at |
|site, leftover aggregates after completion of concreting results in approx 5-7% wastage. |
|All these wastages are avoided with UltraTech Concrete as it takes care of all ingredients and the ready-to-use product is |
|delivered to the site. |
| |
|Wastage of concrete during handling: Spillage during transporting from the mixer to the point of placing is unavoidable and |
|results in approx 0.5-0.7% wastage. |
|UltraTech Concrete facilitates pumping of concrete to the point of placing and hence there is no wastage due to spillage etc.|
|The leftover concrete in pump-hopper can be used for site casting. |
|...