Work Breakdown Structure (Wbs)

Submitted by: Submitted by

Views: 297

Words: 842

Pages: 4

Category: Business and Industry

Date Submitted: 02/14/2014 08:17 PM

Report This Essay

WBS for Remodeling the Master Bathroom

A work breakdown structure (WBS) “is a view into the project which shows what work the project encompasses” (Piscopo, 2013, para. 1). Whether a project is personal or professional a WBS helps to develop a schedule and define what needs to be done to get the project completed. In the following WBS for a bathroom remodel, there are three levels. The first level defines what the work breakdown structure is for, while the second level breaks down the “high-level work that serve as the basic components of a project,” (Barkley, 2006, p. 51). The third level will breakdown each summary task into subtasks with the assigned resource that is responsible for completing that task (Barkley, 2006).

|Level 1 |Level 2 |Level 3 |

|1 Remodeling Master |1.1 Budget |1.1.1 Determine Available Funding - Homeowner |

|Bathroom |1-2 weeks |1.1.2 Obtain Contractor Quotes – Homeowner/PM |

| |1.2 Planning |1.2.1 Choose Contractor - Homeowner |

| |1 week |1.2.2 Create Scope of Work - Contractor |

| |1.3 Design |1.3.1 Choose Materials - Homeowner |

| |2 weeks |1.3.2 Create Architectural Plans - Architect |

| | |1.3.3 Obtain Permits - Contractor |

| |1.4 Construction |1.4.1 Demolition – Construction Team |

|...