The Installation and Commissioning of Jaw Crusher Machine

Submitted by: Submitted by

Views: 72

Words: 414

Pages: 2

Category: Music and Cinema

Date Submitted: 07/23/2014 02:13 AM

Report This Essay

Jaw crusher is the traditional equipment which crushes some mineral materials by rotating jaw plate. For domestic crushing equipment development, we have a great distance comparing domestic manufacturing technology with the international advanced technology. So we should make great effort in improving crushing equipment quality. Operating and commissioning guidance of jaw crusher:A. operating procedures of jaw crusher:1, complying with the casting procedures.2, check the tightness of V-belt (flat belt) and wear; if too tight, too loose, or badly worn, please promptly adjust or replace the belt.3, check the wear of the guard on both sides, if badly worn and it should be replaced.4, according to process requirements of the block, adjust palatal plate opening size.5, if there is no guard or protective cover is not intact, it may not drive, in order to avoid personal injury.6, pull the belt and confirm the device rotation flexibility and then load test.7, allowed feeding crusher until jaw crusher equipment idling normally. Feeding should be uniform, not allowed to join the rest of the material block.8, often pay attention to jaw crusher discharging; if clogging, timely clear it.Scientific management, advanced processing technology and innovative manufacturing theory make Fote Heavy Machinery become the exporting base of mobile cone crushing plant, wheel sand washer and famous grinding equipment in China. What Hongxing has done is for the clients and we believe that quality is the best way to develop market.9, before stopping, you must crush all material block before parking.B. Jaw crusher installation and commissioning:1,Jaw crusher should be installed in place rain-proof, not exposed to the weather.2,Jaw crusher machine motor should be installed in the rear of the jaw crusher, the direction of rotation must be in accordance with the requirements.3, the machine should be firmly set in the concrete floor, foundation should leave a row of the mine shafts, the slope is...