Do You Know the Working Principle of Concrete Mixing Plant

Submitted by: Submitted by

Views: 85

Words: 256

Pages: 2

Category: Other Topics

Date Submitted: 09/23/2014 06:23 PM

Report This Essay

Concrete mixing plant is divided into four parts: gravel feeding, powder (cement portable water well drilling rigs for sale, fly ash, and expansion agent) feeding cement batching plant, water and admixture feeding small rock crusher, and transmission mixing and store. Its work process: after the mixing control system electrifying, entered people-machine dialogue of operation interface, the system proceed the initialization, which including formula, and concrete level, and slumps, and production.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:planetary concrete mixer,SICOMA Twin Shaft Concrete Mixer for Sale,skip type batching plant,etc. We will provide you with the best product and service.

According to the weighing to test each bunker and the weighing hopper, and the signal of output material empty or material full can prompt operation personnel determines whether starts the mixing control program. Started sand and stone belt motor feed the material into the weighing hopper; open the butterfly valve of fly ash and cement tank, and start spiral machine motor to convey fly ash and cement to the weighing hopper; open the control valve of water warehouse and admixture pool to make water and admixture inflow the weighing hopper.

After the measurement meet the setting requirements, open the gate of weighing hopper, ingredients entered the started mixer and mixed inside, and to setting time, open the door of concrete mixers, the concrete entered into the mixing truck.