Acct 301 Final Exam-2015

Submitted by: Submitted by

Views: 10

Words: 1623

Pages: 7

Category: Other Topics

Date Submitted: 12/15/2015 04:08 AM

Report This Essay

ACCT 301 Final Exam-2015

IF You Want To Purchase A+ Work then Click The Link Below For Instant Down Load

http://www.hwspeed.com/ACCT-301-Final-Exam-2015-0404044436134.htm?categoryId=-1

IF You Face Any Problem Then E Mail Us At JOHNMATE1122@GMAIL.COM

Question

Student Name: ________________________________________

If you find it helpful, you may create an Excel file to show your work for numerical problems. You must show your work including calculations to receive full credit.

Additionally, your work must be presented in a logical, easy to follow manner for full credit. Partial credit will be given for incorrect answers if you show your work.

The point breakout of the questions is as follows:

Question 1 6 Question 10 6

Question 2 6 Question 11 25

Question 3 6 Question 12 10

Question 4 6 Question 13 15

Question 5 6 Question 14 1214114 10

Question 6 6 Question 15 15

Question 7 6 Question 16 10

Question 8 6 Question 17 10

Question 9 6 Question 18 20

Total 175

Part 1: Multiple Choice

Questions 1 – 10 are each worth 6 points. Please place your answer in the chart below.

Question # Answer Question # Answer

1 6

2 7

3 8

4 9

5 10

Question 1

Of the following manufacturing operations, which is best suited to the utilization of a job order system?

a. Helicopter manufacturing.

b. Soft drink bottling operation.

c. Crude oil refining.

d. Plastic molding operation.

Question 2

Costs that do not change when the activity base fluctuates are known as:

a. Variable costs

b. Discretionary costs

c. Fixed costs

d. Mixed costs

Question 3

The basic difference between a static budget and a flexible budget is that:

a. A flexible budget considers only variable costs, but a static budget considers all costs.

b. Flexible budgets allow management latitude in meeting goals, whereas a static budget is based on a fixed standard.

c. A static budget is for an entire production facility, but a...