Cylinder Failure of the Concrete Mixing Station

Submitted by: Submitted by

Views: 10

Words: 269

Pages: 2

Category: Literature

Date Submitted: 12/17/2015 10:34 PM

Report This Essay

(1) in the cylinder, leakage leakage, generally due to the piston rod installation eccentricity egg laying type block machines, lubrication oil supply shortage, sealing ring and sealing ring wear or damage, the cylinder has impurities and piston rod has scars, etc.. It is necessary to adjust the center position of the piston rod. It is necessary to check the reliability of the oil mist and remove the impurity in time.Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:block making machine,concrete batching plants,concrete mixer,blocking making machine,concrete pump,etc. (2) the output force of the cylinder is insufficient and the movement is not stable, generally because of the piston or piston rod is stuck, lubrication, gas supply shortage concrete mixer, or the cylinder has condensate and impurities, etc.. The center position of the piston rod should be adjusted to check the reliability of the work of the oil mist filter and whether the gas supply pipeline is blocked or not, the condensate water and impurities in the cylinder should be cleared in time. (3) the cylinder buffer effect is poor, generally because of the buffer sealing ring wear or adjustment screw damage, should replace the sealing ring and adjusting screw. (4) the piston rod and cylinder head damage, generally due to the piston rod installation eccentric or buffer mechanism, should adjust the center position of the piston rod batching plant for sale, and replace the buffer sealing ring or adjusting screw.