Fishbone Diagram
Personnel with lack of quality attitude
Equipment’s performance is failing
Personnel Equipment
Inadequate equipment
Lack of training to machine operator
No scheduled preventive maintenance
Not taking immediate actions to resolve the problems
Greasex cans “rejects”
Nozzle heads with burrs that prevent proper fitting
Need to make on time deliveries and cost improvements
Inefficient communication between managers and employees through-out the production plant
Design of the can was not tested by engineers
Increased demand need to be met
Intense pressure to meet production quotas
Product Design Production Management
Continuous Improvement Program
* Implementing a total quality management strategy within the organization that ensures the involvement and cooperation of the entire workforce.
* Developing quality specifications for the Greasex product by reviewing the design quality, conformance quality, and quality of the source. This means that the design and packaging department will need to address the issue of the burrs in the nozzle heads with the vendor and get it resolved, testing will need to be performed on the design of the cans to ensure that the aesthetics is not an issue for the product filling, the product specs will be clearly defined and production will need to comply with these standards, and the personnel will take responsibility over the quality of the product.
* Analysis and testing will be necessary to identify the most influential causes of the greases rejects and a project plan will need to be put in place to address each of these issues.
* Utilizing multiple tools, such as charts, checklists and diagrams that show the performance of the various processes involved in the Greasex production: employee metrics, defects found by the inspector, number of times that a product had to be reworked, cost of scrapped product, etc. This...