Submitted by: Submitted by carolkellyas
Views: 10
Words: 271
Pages: 2
Category: Other Topics
Date Submitted: 02/17/2016 10:20 PM
NETW 310 Week 3 Lab Installing Structure Cabling
Purchase here
http://devrycourse.com/netw-310-week-3-lab-installing-structure-cabling
Product Description
iLab 3: Installing Structure Cabling (70 points)
Note!
Submit your assignment to the Dropbox located on the silver tab at the top of this page.
(See the Syllabus section "Due Dates for Assignments & Exams" for due dates.)
iLAB OVERVIEW
Scenario and Summary
For this week's lab, you will watch a video on Installing Structured Cabling. To start watching the video, go to the Tutorial Box and click on the Installing Structured Cabling blue link. Click on START in the lower right-hand corner when the page displays.
Deliverables
You are required to submit a lab report to the Week 3 Dropbox.
iLAB STEPS
STEP 1: Watch Tutorial
Back to Top
Watch the tutorial on Installing Structured Cabling below.
Tutorial
[img border="0" width="272" height="192" src="file://localhost/Users/mariangergi/Library/Caches/TemporaryItems/msoclip/0/clip_image001.png" align="right" alt="Описание: https://devry.equella.ecollege.com/file/39863a17-45ce-44f5-8d0c-d6163aaef253/1/images--netw310_structured_cabling.gif" v:shapes="AutoShape_x0020_4">
This tutorial provides you with examples of the correct and the incorrect ways to install the various aspects of a structured cabling system in a typical office building.
Click on the link above, or the image to the right, to begin.
STEP 2: Download Lab Report Template
Back to Top
Download this week's Lab Report Template.
STEP 3: Answer the questions
Back to Top
Answer the questions concerning what is shown.
STEP 4: Submit Your Work
Back to Top
Submit your completed report to the Week 3 Dropbox.