Devry GSCM 520 Week 4 Quiz
IF You Want To Purchase A+ Work then Click The Link Below For Instant Down Load
http://www.acehomework.net/?download=devry-gscm-520-week-4-quiz
IF You Face Any Problem Then E Mail Us At JOHNMATE1122@GMAIL.COM
Devry GSCM 520 Week 4 Quiz
Page 1
Question 1. 1. (TCO 7) Using the assembly-line balancing procedure, which of the following is the theoretical minimum number of workstations if the task times for the six tasks that make up the job are 4, 6, 7, 2, 6, and 5 minutes and the cycle time is 10 minutes? (Points : 3)
Three
Five
Six
Eight
None of the above
Question 2. 2. (TCO 7) You have just determined the actual number of workstations that will be used on an assembly line to be eight using the assembly-line balancing procedure. The cycle time of the line is 10 minutes and the sum of all that tasks required on the line is 60 minutes. Which of the following is the correct value for the resulting line's efficiency? (Points : 3)
0.500
0.650
0.750
0.850
None of the above
Question 3. 3. (TCO 7) Which of the following is not a step in developing a manufacturing cell layout? (Points : 3)
Grouping parts into families that follow a common sequence of steps
Identifying dominant flow patterns of parts families as a basis for location of processes
Physically grouping machines and processes into cells
Disposing of left-over machinery and outsourcing ungrouped processes
None of the above
Question 4. 4. (TCO 7) A difference between project and continuous flow categories of process flow structures is which one of the following? (Points : 3)
The size and bulk of the product
Discrete parts moving from workstation to workstation
Degree of equipment specialization
Being a Virtual Factory
Profit per unit
Question 5. 5. (TCO 7) Which of the following is a basic type of...