Devry Gscm 520 Week 4 Quiz

Submitted by: Submitted by

Views: 10

Words: 594

Pages: 3

Category: Other Topics

Date Submitted: 03/29/2016 11:10 PM

Report This Essay

Devry GSCM 520 Week 4 Quiz

IF You Want To Purchase A+ Work then Click The Link Below For Instant Down Load

http://www.acehomework.net/?download=devry-gscm-520-week-4-quiz

IF You Face Any Problem Then E Mail Us At JOHNMATE1122@GMAIL.COM

Devry GSCM 520 Week 4 Quiz

Page 1

Question 1. 1. (TCO 7) Using the assembly-line balancing procedure, which of the following is the theoretical minimum number of workstations if the task times for the six tasks that make up the job are 4, 6, 7, 2, 6, and 5 minutes and the cycle time is 10 minutes? (Points : 3)

Three

Five

Six

Eight

None of the above

Question 2. 2. (TCO 7) You have just determined the actual number of workstations that will be used on an assembly line to be eight using the assembly-line balancing procedure. The cycle time of the line is 10 minutes and the sum of all that tasks required on the line is 60 minutes. Which of the following is the correct value for the resulting line's efficiency? (Points : 3)

0.500

0.650

0.750

0.850

None of the above

Question 3. 3. (TCO 7) Which of the following is not a step in developing a manufacturing cell layout? (Points : 3)

Grouping parts into families that follow a common sequence of steps

Identifying dominant flow patterns of parts families as a basis for location of processes

Physically grouping machines and processes into cells

Disposing of left-over machinery and outsourcing ungrouped processes

None of the above

Question 4. 4. (TCO 7) A difference between project and continuous flow categories of process flow structures is which one of the following? (Points : 3)

The size and bulk of the product

Discrete parts moving from workstation to workstation

Degree of equipment specialization

Being a Virtual Factory

Profit per unit

Question 5. 5. (TCO 7) Which of the following is a basic type of...