Material Management - What Is a Material Requirements Plan What Is the Difference Between Dependent and Independent Demand Explain with Examples

Submitted by: Submitted by

Views: 10

Words: 472

Pages: 2

Category: Other Topics

Date Submitted: 08/19/2016 03:35 AM

Report This Essay

Need Answer Sheet of this Question paper, contact

aravind.banakar@gmail.com

www.mbacasestudyanswers.com

ARAVIND – 09901366442 – 09902787224

Material Management

Q1. What is wealth, and how is it created? What is value added, and how is it achieved? Explain with examples?

Q2. What is a material requirements plan? What is the difference between dependent and independent demand? Explain with examples.

Q3. Complete the following table. Lead time for the part is two weeks. The lot size is 100. What is the projected available at the end of week 3? When is it planned to release an order?

Q4. What is capacity planning? What are the responsibilities of capacity management? Describe the steps in capacity planning? Explain with examples?

Q5. What is the responsibility of production activity control? What are the major functions of planning, implementation & control? Explain with examples?

Q6. An order for 50 of a product is processed on world centers A and B. The setup time on A in 60 minutes, and run time is 5 minutes per piece. The setup time on B is 30 minutes and the run time is 6 minutes per piece. Wait time between the two operations is 10 houses. The move time between A and B is 60 Minutes. Wait time after operations is 10 houses. The move time into stores is 2 houses. The move time into stores is 2 hours. Queue at work center A is 40 hours and at B is 35 hours. Calculate the total manufacturing lead time for the order. And also calculate the total manufacturing lead time for the order.

Q7. What is period order quantity? How is it established? When can it be used? Explain with examples? Also define 1) Annual ordering cost 2) Annual Carrying cost 3) Total annual cost. With some examples?

Q8. The standard deviation of demand during the lead time is 100 units.

a)Calculate the safety stock required to increase the service levels from 75% to 80%, 85% to 90%, 90% to 99.99% ? What conclusion do you reach.