Organisational Behaviour
Airbus A380
1. What are the 4 main cluster causes groups in relations to the delay?
- Plans were constantly changed
- Communication problems
- Rising Development cost
- Delay of delivery for the airbus 380
2. Place them in a fishbone diagram
Blaming each other(
Spec’s demand(
(Complex cable system ( different computer systems
High pressure ( language problems (
( New problems ( taking responsibility
Poorly designed cable system ( (communication
(biggest aircraft ever between stations
Slow problem solving (
(stagnation in constuction
More luxurious ( (underestimation of the problems
For the cable system (
3. Provide for each main branch 4 sub causes determined by answering the WHY questions
- Plans were constantly changed
o Individual specs demand by Singapore
o They couldn’t find a solution for the complex cable system
o High pressure
o More problems were discovered
- Communication problems
Because of this there was rivalry between the two locations
o Blaming each other
o Using different computer programs
o Language difference
o Refusing taking responsibility
- Rising Development cost
Because of the development cost were so high they needed to sell at least 500 airbus a380, but they only had sold 180 on the moment
o Engineers underestimated installing the cabin with such a complex cable system
o Electrical wiring system poorly designed
o So much luxury
o They never build such a big airplane before
- Delay of delivery for the airbus 380
o Slow problem solving
o Underestimating the complexity of the cable system
o lack of communication between work locations
o Stagnation in the process of construction
4....