Submitted by: Submitted by klewlezz
Views: 319
Words: 336
Pages: 2
Category: Business and Industry
Date Submitted: 01/24/2012 09:56 AM
M1
OPERATION Crossing
Nightingale
Lagoon
by
boat Visit
to
Master's
Falls Shooting
the
El
Lento
rapids Crossing
Nightingale
Lagoon
by
boat Visit
to
Master's
Falls Drive
through
Madera
woods Birdwatching
Area El
Lento
Rapids White
Grotto
TIME
Total Longest
A 30 x 120 x 240 x 30 x 60 x 180 90 120 x 90 60 180 360
PROCESSORS F D B C
H
x x 90 90
M2 Crossing
Nightingale
Lagoon
by
boat Visit
to
Master's
Falls Shooting
the
El
Lento
rapids Crossing
Nightingale
Lagoon
by
boat Visit
to
Master's
Falls Fishing
Reserve Walk
around
Nightingale
Lagoon
Walk
through
Madera
Woods Birdwatching
Area Crossing
Nightingale
Lagoon
by
boat Visit
to
Master's
Falls Drive
through
Madera
woods Birdwatching
Area El
Lento
Rapids White
Grotto To
St.
Pontuis'
Hermitage
in
atv Deer
Pool White
Grotto St.
Pontius'
Hermitage
A 30 x 120 240 30 x 120 600 0 480 120 30 x 60 180 90 120 90 0 300 120 0 Total 90 Longest 30
B
C
D
E
F x
G
H
i
x x x x x x x x x x x x x 660 210 360 480 120 240 0 300 300 210 600 0 120 300 120 600
Total
N°
of
units
Availability
Usage
Capacity
RESOURCES available (min/hr) (min/grp) (grp/hr.) Utilization A 3 180 30 6 8% F 2 120 120 1 50% D 2 120 240 0.5 100% B 4 240 0 C 2 120 90
1.33 H 2 120 90
1.33
N°
of
units
RESOURCES available A 3 B 4 C 2 D 2 E 10 F 2 G 5 H 2 I 5
Total
Availability
Usage
(min/hr) (min/grp) 180 30 240 480 120 120 120 240 600 0 120 120 300 300 120 120 300 600
Capacity
(grp/hr.) 6 0.5 1 0.5 1 1 1 0.5 2.5...