POST HARVEST - Rice Milling
Block 1. Basics.
1 | Date | | 5 | Age | |
2 | Name (owner) | | 6 | Education | |
3 | Address | | 7 | Caste | |
4 | | | 8 | | |
5 | Contact | | | | |
Block 2. Mill History and Size | |
| | |
S.No. | | |
I | Mill basics | |
1 | Mill type (huller, sheller) | |
2 | Year of Establishment | |
3 | Land Area (cents) | |
4 | Total Built-up Area, including all structures and multiple storeys (cents | |
5 | Roofed area (cents) | |
6 | Roofing material | |
7 | Concrete drying yard area, if any (cents) | |
8 | Value of the mill today - machinery | |
9 | Value of mill today - land | |
10 | Maintenance costs for machinery last year | |
II | PARBOILING | |
1 | Is parboiling done on site (Y/N) | |
2 | What proportion of rice milled on site is parboiled | |
III | RICE FLOUR MILLING | |
1 | Is rice flour milling also done on site | |
2 | If yes, what proportion of rice milled is converted into flour | |
| Comments | |
Block 3. Volume Milled
1 | Size of batch load (tonne) (for parboiling) | |
2 | Capacity (t/month) | |
3 | High season max capacity achieved (t/month) | |
| High season total volume processed (tonnes) | |
4 | Length of high season (months) | |
5 | Low season max capacity achieved (t/month) | |
| Low season total volume processed (tonnes) | |
6 | Length of slack season (months) | |
7 | Annual milling (tonnes) | |
8 | Comments | |
Block 4 Parboiling Boiler and Dryer | | |
S.No. | Particulars | Boiler | Dryer |
| | a | b |
1 | Weight (kg) | | |
2 | Is it a boiler+drier | | |
3 | Main Fuel used (Husk, sawdust, firewood) | | |
4 | Main fuel use (kg/batch) | | |
5 | Why that fuel | | |
6 | Main fuel - own/purchased | | |
7 | If own, from on site or from outside | | |
8 | If from outside distance of source (km) | | |
9 | If purchased, price...