Installation and Commissioning of Pebble Sand Maker

Submitted by: Submitted by

Views: 151

Words: 387

Pages: 2

Category: Business and Industry

Date Submitted: 11/07/2012 01:09 PM

Report This Essay

Installation of pebble :

1. Pebble sand maker is installed on concrete or steel structure on the basis from the foundation need to be capable of withstand 4 occasions the machine weight.

2, with broken airport diverse installed in the plant operation or installed within the open air operations. Ought to be installed crusher leveling so that the spindle and horizontal vertical.

3.River pebbles above the ought to be set towards the lifting gear,lifting equipment capability based on the weight with the crusher, lifting space must be left in the river gravel above the sand producing machine, to keep in the river gravel, sand making machine side of your appropriate space toprepared overhaul.

Commissioning of pebble sand maker:

River gravel, sand making machine inside the factory, the factory has eight compact space timeload operation, the ministries is regular, having said that, in the river gravel, sand producing machine on web site installation in place, really should continue to conduct a comprehensive inspection.

1, Check the oil pipe is connected securely, commissioning should be re added when the oil.

2, check all elements connected, must be solid and reliable, cautiously check the impeller on a foreign physique, if any must be right away removed.

3, check the motor wiring is correct, the normal voltage (380V 5%).

four.Prior to putting in the belt, very first start the motor rotation using the sand generating machine signage course (ie from the feed port and the impeller counterclockwise rotation) if it's contrary to the indicators path to adjust the motor wiring to make it spin to consistent with the indicators direction, never permit the rotation in the opposite path.

5, dual motor driven spindle assembly, with both sides with the motor, respectively, with the very same variety of triangular tape and spindle assembly is connected to each sides in the triangle belt tensioning really should be adjusted the identical, and straight. Right...