Submitted by: Submitted by swlhomebusiness
Views: 474
Words: 816
Pages: 4
Category: Business and Industry
Date Submitted: 01/13/2013 08:06 PM
Scope Statement
Project Objective:
To redevelop an old playground into a safe, more stimulating environment within 4 ½ months at a cost of no more than $63,000.
Deliverables:
* A fort area with the following:
* Free of graffiti
* Replaced roofing structures
* Repainted
* Replacement of damaged wood
* Sanded down for safety and prevention of splinters
* New swings with coated plastic over the metal chains
* New slides that are reinforced and made of plastic (to replace old metal slides)
* Monkey bars and other climb structures replaced with new coated metal
* New benches for parents with small gazebo for shade
* Astroturf and rubber play mats in play areas
* Repaved basketball court that is repainted
* New basketball hoops
* Tires replaced on tire swings
* Sidewalks around play area for bike riding
* Decorations (such as roofing, painting, colored mats, etc.) to make playground more attractive
* Planting of new vegetation around playground (after research of safe plants) to reinforce boundaries (trees, bushes, etc.)
* A new smaller/younger children play area (to attract new children/families), including:
* Small slides
* Rubber play mats for falls
* Low level climb areas
* Tubes to climb through
* Low, coated monkey bars no higher than 4 feet
* Low level balancing areas
* Wheels and music areas
Milestones:
* Inspection of playground including measurements
* Determination of materials needed including budget
* Finished surface areas (Astroturf replacement and rubber mats in small child areas)
* Finished fort area as determined by deliverables
* Finished basketball courts (including new hoops and paint) and sidewalks for biking
* Finished swings and slides (all types)
* Finished metal replacement, including
* Finished small/younger child play area
* Finished gazebo and benches
* Finished...