The installation of fine crusher

1. the rotor has equalization treatment before leave factory. So the user doesnt need this step. When you replace the hammer and the rotor, you should make the equalization treatment. The balanced error has to less than 0.2kg.

2. the main machine should be adjust stable, the principal axis levelness less than 1mm. Adjust the degree of tightness of the belt and fixed the motor.

3. check up the position of every parts. Make ssecond hand gold mine equipmentsure the right position and isnt out of shape. Locking the all bolts. Whats more, inspect the seal.

4. check up the electrical box wiring and fastening condition. Adjust time (the article in troduction somne machine break and mill )delay relay and overload protect equipment, switch on circuit, and test the electrical machines swerve. Also choose the suitable specification fuse.

5. check up the fixed position and limit position of the sieve right or not. The hammer, lining plate and the sieve whether has struck. The gap of the hammer and the left lining plate is 20 (the article in troduction somne machine break and mill )25mm. The gap of the left down lining plate or the sieve plate is 15 (the article in troduction somne machine break and mill )20mm. The gap of the hammer and the discharge sieve is 10 (the article in troduction somne machine break and mill )15mm.

6. Clean the rubbish the machine. Examine there is any other unusual phenomenon.

Fine crusher ( contect jaw crushe r and mobile crusher and impact crusher and so on )empty test run:

1. After installation and every parts is ok, you could no (the article in troduction somne machine break and mill )load running. If there is some hit against, it belongs to unusual. After 10 seconds, there still has rub, hit against and obvious shaking, you must be power off at once and check up. According to the stoppage of the machine list to check. If there is a big problem, you could inform the servers of our company. The...