Acc 560 Wk 3 Quiz 3 - All Possible Questions

Submitted by: Submitted by

Views: 112

Words: 2259

Pages: 10

Category: Music and Cinema

Date Submitted: 07/29/2014 10:13 PM

Report This Essay

ACC 560 WK 3 Quiz 3 - All Possible Questions

To Purchase Click Link Below:

http://strtutorials.com/ACC-560-WK-3-Quiz-3-All-Possible-Questions-19.htm

ACC 560 WK 3 Quiz 3 - All Possible Questions

TRUE-FALSE STATEMENTS

    1.     Process cost accounting focuses on the process involved in mass-producing products that are very similar in nature.

 

    2.     Process cost systems are used to apply costs to a specific job, such as the manufacturing of a specialized machine.

 

    3.     A company that produces motion pictures would likely use a process cost system.

 

    4.     In a process cost system, costs are tracked through a series of connected manufacturing processes or departments, rather than by individual jobs.

 

    5.     In a process cost system, total costs are determined at the end of a month or year.

 

    6.     Separate work in process accounts are maintained for each production department or manufacturing process in a process cost system.

 

    7.     In a process cost system, materials, labor and overhead are only added in the first production department.

 

    8.     The assignment of the three manufacturing cost elements to Work in Process in a process cost system is the same as in a job order cost system.

 

    9.     Fewer materials requisitions are generally required in a process cost system than in a job order cost system.

  10.     In a process cost system, labor costs incurred may be captured on time tickets.

 

  11.     A primary driver of overhead costs in continuous manufacturing operations is machine time used.

 

12. Equivalent units of production are used to determine the cost per unit of completed products.

 

  13.     Equivalent units of production measure the work done during a period, expressed in fully completed units.

 

  14.     Equivalent units of production is the sum of units completed and transferred out plus equivalent units of beginning work in process.

 

 

  15.     The weighted-average...