Four Installation Processes of Belt Conveyor

Submitted by: Submitted by

Views: 146

Words: 395

Pages: 2

Category: People

Date Submitted: 07/30/2013 01:02 AM

Report This Essay

Belt conveyor is mainly composed of rack, conveyor belt, belt roll and gearing. It can be used as a material delivery process between the initial feeding mouth and the final discharging mouth.Belt conveyor can not only transport granular material, but also work as a rhythmic flow transportation line complied with the requirements of various industrial production processes. The belt conveyor can be used for horizontal transportation or inclined transportation in a convenient way, and it"s widely used in mine tunnel, mine surface transportation system, open-pit and concentrator, etc. in modern industrial enterprises.Today Henan Hongxing will share tell the installation process of the belt conveyor with you.1. Belt conveyor legs and middle shelf: find a good center line by theodolite before installation, according to the centerline position leads the pile point position of each leg, if embedded iron, we should base on the location of the embedded iron installation companies to adjust the legs.2. Counterweight device: we should guarantee the parallelism between the two force columns when install counterweight device, at the same time should ensure its verticality; after installing weight equipment, we should immediately install protective railings.3. Headstock, tailstock and drive frame: First check the elevation of the installed base, find a good centerline, and pay attention to the head the tailstock axis deviation is less than ± 1.5. In installation, we should also note that the horn settings should be based on the requirements of the specification to locate the horn in the main load-bearing position, each connecting bolt should be placed with one pair of horns on both sides, oblique horn should be set in pairs, the number of horn does not exceed 5, thin horn should be placed in the middle of the thick horn, horn after adjustments should firmly welded on the bolts.4. Roller: roller and roller should be checked for bearing parts rotation circumstances in...