Seven Key Points for Installation and Maintenance of Cement Silo

Submitted by: Submitted by

Views: 10

Words: 257

Pages: 2

Category: Business and Industry

Date Submitted: 12/07/2015 07:31 PM

Report This Essay

1, hoisting before installation: lifting driver, commander, staff hook installation personnel and must carefully check the wire rope, hanging ring is complete and effective, all personnel to cooperate closely, do stability has fallen steadily, steady in place to prevent substantial swing come into contact with other objects.Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:twin-shaft compulsory mixer,concrete batching plants,concrete mixer,blocking making machine,concrete pump,etc. 2, before lifting: working platform frame shall not put any object, to adjust the center of gravity, lifting application snap ring and a safety hook SICOMA Twin Shaft Compulsory Mixers, may not be inclined hoists. 3, the installation: from the inside out once installed, the end of the tank can not be fixed hook. 4, cement warehouse / cement tank shall have the operating platform, the upper and lower ladder, protective railing, if damaged, should be promptly repaired. 5, in the process of lifting: cement silo / cement tank prohibited to stand, must wait for the lift below 1 meters above the ground near the beginning. 6, on-site personnel must wear safety helmet, the operator is strictly prohibited in the field of drinking and fighting. 7, high-altitude operations personnel must wear safety belt, safety belt must be low hanging, walking must not look in all directions egg laying block machine, the rest shall not be close to the body and a protective railing.