Mexico EDIBLE OIL REFINING PLANT holding function in the industrial progress:

For different Edible Oil Refining Plant capacity by different way of Edible Oil Refining Plant deacidifcation, the small cooking oil refinery process can be divided into chemical oil refining and physical oil refining. Normally small oil refining with capacity less than 20 tons per day adopts chemical refining, thinking about Edible Oil Refining Plant cost performance. and small Edible Oil Refining Plant is normally with low automation (called batch oil refining)

--*---*******

Groundnut Edible Oil Refining Plant is very important in the peanut oil making machine. The crude peanut oil still contains many oil-insoluble and oil-soluble impurities that needs use the Groundnut Edible Oil Refining Plant to remove them.

Edible Oil Refining Plant has the first step: the oil insoluble material are removed with filtration and the soluble materials is removed with different processes including degumming (removing of phosphatides), alkali refining (washing with alkaline solution to remove free fatty acids, colorants, insoluble matter and gums) and bleaching(with activated earth or activated carbon to remove color and other impurities.

Groundnut Edible Oil Refining Plant features:

1. Edible Oil Refining Plant Quality: According to the Edible Oil Refining Plant production standard made by the Seller.

2. Edible Oil Refining Plant Production period: Within 45working days after the receipt of advance payment.

3. Edible Oil Refining Plant Delivery: Within 50 working days after receipt of advance payment.

4. Edible Oil Refining Plant Payment: 30% of contract value should be paid by T/T to the Seller’s account as advance payment to start the production, the rest 70% must be paid by T/T before shipment.

5. Edible Oil Refining Plant Guaranty time for 1 year.

6. Edible Oil Refining Plant Installation: we’ll send 5-8 Edible Oil Refining Plant technicians to the buyer’s factory for...