Shale shaker as an important one solid control equipment, Drilling Mud Solids Control Equipment in order to ensure the normal use in the production of shale shaker style after a good tune, you must make the necessary checks before the first operation shale shaker, KOSUN Drilling Mud Solids Control Equipment based on years of production summed up the experience,rilling equipment leasing and customer requirements shale shaker should be prepared ,before the operation of Dwm control to check in five main areas.

Shale shaker of Drilling Mud Solids Control Equipment for the first time before the inspection operation:

1, the body is in a horizontal state.

2, the base is fixed properly. Fixing bracket can be used for fixing.

3, the shale shaker screen is paved.

4, the body of the shale shaker screen frame screws are tightened.

5, the shale shaker screen frame and the base unit is connected to the block removed.

Solids control equipment contains a lot of other devices, you need to do to clean up purification equipment and DWM Solids Control progressively different cleanup. When Drilling Waste Management invasion occurs, we can get through the shale shaker purifying mud into the mud purification tank grit tank, then drilling waste management companies use suction vacuum degasser, causing negative pressure in the vacuum tank, so that the drilling waste management companies in the atmospheric pressure into the deaerator separated sub sort of DWM Solids Control discharged into the top of the derrick venting, except mud gas chambers after emptying rotor driven into the Drilling Waste Management platoon second chamber.