Drilling and Completion of Complex Drilling Waste Management Composition

Submitted by: Submitted by

Views: 45

Words: 309

Pages: 2

Category: Business and Industry

Date Submitted: 01/27/2015 07:38 PM

Report This Essay

Drilling and completion of complex waste composition, stability is particularly strong, due to the different locations to produce, DWM control of effluent quality difference is very large, DWM Solids Control is impossible to a fixed device and effective wastewater treatment processes different fields, conventional treatment processes and equipment Pharmacy greater dependence, and DWM Solids Control is in dealing with the nature of the big differences of Auger between each other high suspended solids, high COD, high salt, high color and other characteristics of the drilling waste water cost is very high, DWM control which determines the drilling sewage treatment plant on the current world the diverse nature.

KOSUN screw conveyor machine

During waste management companies, the daily will produce a lot of waste-containing drill cuttings, is the most well site waste mud, cuttings and associated production waste concentrate discharged into the lagoon, waiting for the sewage tank is subjected to Auger liquid separation treatment. Drilling waste management generated mainly first use of waste liquid chemical destabilization broken plastic flocculation method, and then ,Drilling mud solids control equipment squeeze dehydration technology physical treatment by mechanical equipment. Screw conveyor machine of drilling waste management companies is mainly used to cure before the waste treatment of dehydration.

The working principle and process of Auger:

After the injection of drilling waste management liquid flocculation agent, sufficiently mixed to achieve the effect of breaking the solid-liquid separation at the beginning, and then into the screw conveyor, after breaking abandoned mud with increasing pressure,Drilling mud solids control equipment of dehydration is further squeezed by continuous spinning cycle avoids high filtration resistance, and therefore at a smaller pressure, may achieve higher dewatering capacity, the lower the water content of the finally...