Drilling steps: After drilling work finished, we should measure the water level of the Well and the corresponding water yield. Then the water pump should be chose according to the ground to the dynamic water level elevation difference and irrigation methods. Make sure that the pump flow rate is no more than the well water flow.

Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:planetary concrete mixer,mobile block making machine,twin shaft concrete mixer,etc. We will provide you with the best product and service.

The location of the hole should be set according to local actual hydrogeological condition. In some regions, if the shallow groundwater is not rich, the shallow Wells are totally forbidden ; even in the shallow groundwater rich areas where are suitable for farmers self-built shallow Wells, the hole layout cannot be too close. In this way, we can make sure that there is no mutual influence between adjacent water Wells.

There are two kinds of drilling construction methods: one is the big slot method, artificial digging or blasting construction; the second is the method of open caisson concrete mixing plant, drainage construction or not drainage construction.

mobile block making machine:http://www.blockmakingmachinery.org/products/DMBE6-30-Mobile-Block-Making-Machine.html

concrete mixing plant:http://www.doubleshaftconcretemixer.com/beltplant/hzs60-belt-conveyor-type-concrete-mixing-plant.html