Concrete Transport Pump Leakage Reasons

Submitted by: Submitted by

Views: 10

Words: 299

Pages: 2

Category: Business and Industry

Date Submitted: 12/22/2015 11:01 PM

Report This Essay

Concrete transport pump leakage reasons are mainly the following:Henan Daswell Machinery Co., Ltd,is a professional manufacturer and trader specializing in the research, development and production of construction machinery for nearly 30 years. Our main products are as follows:diesel engine concrete mixer,concrete batching plants,concrete mixer,blocking making machine,concrete pump,etc. 1) the transmission pipe joint seal is not strict Pipeline joints Mifengbuyan, clamp loosening or seal damage and leakage. You should tighten the clamp or replace the sealing ring. 2) the gap between the plate and the cutting ring is too large The gap between the two and the gap between the is serious when the spectacle plate and cutting ring wear serious. When the gap is greater than% - must be shaped by adjusting the bolts to narrow the glasses plate and cutting the gap between the ring, if it has not adjusted, should immediately replace worn parts. This method is only suitable for "S" valve series concrete pump. 3) concrete piston wear Operator should always observe whether the water in the tank is muddy, there is no mortar, once found the water has been muddy or water, the concrete piston has been worn, at this time should be replaced by the piston, concrete pump will be due to leakage and pressure loss and lead to blocking pipe, with the same time will aggravate the wear of the piston and cylinder. 4) due to the serious wear and tear caused by the concrete transport cylinder If every time after the replacement of the piston block making machine, the water in the tank is very fast, and the piston is good, it indicates that the transport cylinder has been worn, the concrete pump at this time need to replace the transmission cylinder.