Netw310W1Labreport4

Submitted by: Submitted by

Views: 125

Words: 306

Pages: 2

Category: Science and Technology

Date Submitted: 09/15/2013 10:42 PM

Report This Essay

NETW310 Week 3 Lab Report

Name: ******

Professor: *******

Course: Wired, Optical, Wireless Communication with lab

Objective or Mission of this Project

This Project has two main sections with a different number of objectives.

Part One:

* Download Lab Report Template

Part Two:

* Answer the 10 questions

Equipment

Hardware

* Toshiba Laptop

* Intel Petium Dual Core (1.73GHz)

* RAM 1.5 GB

* 150 GB Hard Drive

Software

* Widows XP Professional

* Snagit

Part Two

Lab Report

Each answer is worth seven points.

Use a red colored font for you answers.

Place the answers below the questions.

1. May we dig a trench across the city street shown in this lab?

Yes

2. Who issues the permit for this work?

Department of Engineering Services.

3. Must we submit construction plans to the city?

Yes we should submit two sets of plans with the application to the Department of Engineering Services.

4. Once the permit is issued, how long must we wait before commencing work?

Construction must begin no later than 90 days after the permit has been issued.

5. How deep must the cable be buried?

All facilities installed under pavement shall be buried to a minimum depth of 42 inches.

6. What are the exact detailed compaction requirements as listed in the manual provided by the city for restoration of any surface that is trenched?

7. Is the company we hire to do the work required to be registered in any way?

Yes

8. What is a right-of-way?

Rules put in place to protect the environment and people’s rights.

9. When is interference with traffic flow allowed?

7:00 a.m. through 8:30 a.m. and 4:30 p.m. through 6:00 p.m.

10. During what hours may work not be done?

Between the hours of 10:00 p.m. and 6:00 a.m.

More like this